Contractors :
James Carmichael, Ltd.
Architect :
Joseph Emberton, A.R.T.B.A.
OLYMPIA
37,000 YARDS OF
SIEGWART PRE-CAST FLOORS
Speed is the essence of Building Contracts, and the more work prepared away from the site, the greater the saving of time on the
The delays occasioned by bad -, centering, etc., are all obby using Siegwart Pre-cast e Beams; they are delivered job thoroughly matured, and used 48 hours after fixing.
lOORS AND ROOFS THE SIEGWART ED AND SIMPLICITY WITH HIGHEST \LS AND WORKMANSHIP AND ^RANTEED DESIGN.
pi PROOF FLOOR CO. LTD. E, 231 STRAND, LONDON
Branches at
^CHESTER, GLASGOW, BELFAST
A CORNER OF THE NEW
OLYMPIA
EXTENSION