SIEGWART
REINFORCED CONCRETE FLOORS
LOW IN COST PERMANENT
SOUND-RESISTING FIRE-RESISTING
CROYDON
AERODROME
CONSTRUCTED UNDER THE DIRECTION AND SUPERVISION OF THE
AIR MINISTRY.
LONDON TERMINAL BLOCK.
Costs no more and effects a great saving of time. Can be laid at the rate of 1, 000 yards per week, and is ready for use 48 hours after fixing.
REINFORCED CONCRETE FLOORS
LOW IN COST PERMANENT
SOUND-RESISTING FIRE-RESISTING
CROYDON
AERODROME
CONSTRUCTED UNDER THE DIRECTION AND SUPERVISION OF THE
AIR MINISTRY.
LONDON TERMINAL BLOCK.
Costs no more and effects a great saving of time. Can be laid at the rate of 1, 000 yards per week, and is ready for use 48 hours after fixing.